     冷库验收时的几点建议
    但是很多人在冷库工程结束后验收时却比较犯怵,作为承建方和使用方,当冷库工程完工后,应及时组织验收,下面大概说几点冷库验收的注意事项和建议。
    一、冷库库体外观验收:
    冷库库体的安装是否协调,库板与库板之间的衔接是否严密,冷库门安装是否稳重厚实,密封胶密封是否密不漏缝,冷库门四周以及门框四周的塑胶条是否牢固,地面是否平整。
    二、室内外主机验收:
    冷库在验收时不光要看冷库温度,室外主机安装也需要看看是否有稳固、主机细小的焊接部位是否有松动,主机尽量不要露天放置在外面,搭上顶棚和固定架,雨淋日晒的外主机部分部件比较容易腐蚀生锈,且在长期运行后,部分部件松动现象。室内风机安装是否牢固、管路安装是否规范、气密试验结果确认、冷库密封是否严实(看是否透气透光)附属设备是否安装。
    三、制冷系统运行验收:

    室内外风机工作及转向状况、控制系统是否准确符合要求、附属设备是否工作正常、冷库运行数据记录(实测数据)大体上冷库库体完工后,主体部份验收事项就这些,每一个承建单位也会对自己所做的工程进行验收的,合格后才会移交客户使用。

    Suggestions for acceptance of cold storage
    Usually, the head of the household will negotiate with the construction of the cold storage project on the design of the cold storage, the construction requirements of the cold storage, the construction period of the cold storage, and the payment method for the cold storage.
    However, *ny people are relatively guilty of accepting the cold storage project after the end of the cold storage project. As the contractor and user, when the cold storage project is completed, it should be organized for acceptance in a timely *nner. The following are a few notes and suggestions for the acceptance of the cold storage.
    At the time of acceptance, pay attention to the acceptance content:
    First, the appearance of the cold library body acceptance:
    Whether the installation of the cold library body is coordinated, whether the connection between the library board and the library board is tight, whether the cold library door is stable and thick, whether the sealant seal is tight and tight, whether the plastic strips around the cold library door and around the door frame are solid, The ground is flat. Cold storage online *.lenglian8.com
    Acceptance of indoor and outdoor hosts:
    When the cold storage is accepted, it is not only necessary to look at the temperature of the cold storage. The installation of the outdoor host also needs to see if there is a solid, s*ll welding site of the host is loose. The host should not be placed outside in the open air and put on the roof and holder. Some parts of the external host are easily corroded and rusted by rain and sun, and some parts are loose after long-term operation. Whether the indoor fan installation is firm, whether the pipeline installation is standardized, the air density test results //confirm/i/i, whether the cold storage seal is strict(to see whether breathable light) whether the accessory equipment is installed.
    III. Acceptance of operation of refrigeration system:
    After the indoor and outdoor fan work and steering conditions, whether the control system is accurate and meets the requirements, whether the auxiliary equipment is wo*ng nor*lly, and the cold storage operation data record(measured data) is generally completed, the *in part of the acceptance of the cold storage storage body is these *tters. Each construction unit will also do its own project acceptance, after passing will be handed over to customers.